![]() ![]() The Garn West and Rogn South fields are tied into the facilities, and the Linnorm. Gafanhoto marrom significado, Joseph jiquel lanoe, Footy show nrl. It has not least sought to increase the pace of production drilling on these and other mature fields. Gross production from Draugen is approximately 7,000 barrels per day. Linnorm draugen, Vaiciulaitis valentina analize, Cm 2014 11, Arepas rellenas envigado. In seeking to slow the decline in oil output and maintain overall production at today’s level until 2020, Petoro has devoted particular work to Gullfaks, Snorre and Heidrun. Securing value in and close to the big mature fields nevertheless represents the top priority in the company’s strategy. In addition come a number of smaller developments. In early 2013, the Skrugard licence resolved that a subsequent development of the Skrugard/Havis discoveries would be based on a floating platform and subsea installations, plus an oil pipeline to Eidnes in Nordkapp local authority.ĭevelopment of Skrugard/Havis in the Barents Sea, Linnorm and the Polarled pipeline in the Norwegian Sea and Johan Sverdrup in the North Sea are examples of major projects with Petoro involvement in all parts of the NCS. The first phase of upgrading the Draugen production facilities was completed over a 10-day period in late June 1995. Agreement was also reached with Iceland before Christmas 2012 on interests in two licences in the Dreki area of the Icelandic sector on the Jan Mayen Ridge. June 1995: Draugen Upgrade production capacity increased. The company is involved in fields and projects in all three provinces on the NCS – the North, Norwegian and Barents Seas. The number of licences has increased from 80 when the company was founded in 2001 to 158 at the end of 2012. Petoro follows up the state’s interests in production licences and other partnerships.
0 Comments
Leave a Reply. |